
Project Details:
When Baptist Health Network outgrew its headquarters, it relocated to a new facility. However, the power infrastructure was not up to code. Our solutions met the NEC 700.3 requirement for backing-up the back-up emergency power supply.
Solution Provided:
We installed a Trystar Generator Docking Station that enables the maintenance team to safely disengage the permanent generator and manually connect a roll-up generator in the event of a major power failure. The Trystar solution is an easy, simple to implement solution that will save the facility time and money year over year.